A KPI for a function is a measurable value that demonstrates how
effectively a function is meeting organizational objectives. KPI needs to be specific,
measurable, realistic, and communicated to concerned key functional team
members to accomplish.
How to develop KPI
For developing a robust KPI system,11 business activities are
considered essential in each of the 3 Project design and engineering functions
as below.
· Sharing of
corporate targets like Sales nos, Revenue and Construction costs &
Completion targets with HOD of Design of Architectural, Interior designing, and
Design of MEP
·
Design of
format/contents of KPI with inputs from CEO/MD
·
Identify important KPI for
each of the 3 design functions based on corporate objectives and external
influences like customer demand or & competitors’ offerings or &
economy or &statutory considerations
·
Proposing
initial KPI Targets and Measures
by HOD of design functions
· Reviewing, modifying,
and approving the respective design team’s KPI by CEO/MD
· Putting up measurement systems
in place like reports /dashboards
§ Higher level:
directors-, HOD/Chief designer, General managers-GM, and so on as applicable
§ Middle level:
senior manager-sr. mgr, manager, and so on as applicable
§ Lower level:
assist. manager/junior mgr., staff, and workers so on as applicable
·
Monthly capturing of actual accomplishment of KRA by respective
teams in templates
· Periodic review
of Actual accomplishment of KPI vs Target
· In exceptional cases,
reviewing, updating, and resubmitting KPI to CEO/MD
·
Compile Level-wise Actual vs Target of KRA and forward updated
reports to the HR team for subsequent annual performance appraisal
system at each level.
Suggested Template for
KPI -An Illustration
Based on the above, a template with 9
columns and 20 rows is proposed below for the 3 Design functions which can be
populated by the HOD of Architect, Interior design, and MEP design respectively
S.no |
Suggested KPI
|
Measure of accomplishment
|
UOM
|
%
Weight- age
|
Target
|
Actual
|
Score earned based on col 7/6x5 |
Remarks |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
1 |
No of the projects for which Architectural, Interior, and MEP designs
were commercialized successfully |
New projects
commercialized |
Nos |
5 |
|
|
|
Approval of
Sample flat or mockup unit by potential customers leading to booking |
2 |
Benchmarking of competitor’s projects
|
Site Visits
to Sample apartments or & completed Construction projects to gather
unique project features |
Nos |
5 |
|
|
|
Presentation
to Promoters of the features and our plans to offer even better features in
design plans |
3 |
Mockup unit Development costs Costs include: i)Direct
-pro-rata costs of dedicated manpower for
Architecture, Interior design, or MEP functions + ii)Outsourced
consultancy iii)Mockup
unit -costs of BOQ -local+ imports (excluding Interior design & MEP) + iv)Costs of
consumables+ v)Costs of
manpower for the construction of mockup+ vi)Dedicated
Software+ vii)Travel
costs directly related to Project+ viii)Rework
costs+ viii)Surplus
BOQ samples that are unusable Excludes
-manpower engaged in supporting existing models |
Mockup/sample
room costs |
Rs or
USD/Project or Rs /USD |
5 |
|
|
|
|
4 |
Timeliness -for preparation, release & approval of design works vis a vis Developing Concept design |
On-time release - score on a
5-point scale, with five being excellent /delightful & 1 being poor |
score |
5 |
|
|
|
From the
Start of Go ahead given by the promoter for designing the specific
Projects |
5 |
Timeliness -for preparation, release & approval of design works vis a vis Developing Schematic design |
As above |
score |
5 |
|
|
|
|
6 |
Timeliness -for preparation, the release of design works for obtaining Sanction design from statutory authorities (This KPI
may not apply to Interior design) |
As above |
score |
5 |
|
|
|
|
7 |
Timeliness -for preparation, the release of design works vis a vis detailed Design-Based on statutory
approvals including RERA/Statutory body as applicable |
As above |
score |
5 |
|
|
|
|
8 |
Timeliness -for preparation, comprehensiveness, and release of Tenders vis a vis technical design aspect, including
designs/technical specifications ·
Structure
works ·
Civil
works ·
Façade
works ·
Landscape
Works-Hardscape ·
Landscape
works-Softscape ·
Interior design -Finishing ·
Interior design -FFE works ·
Interior design -Artwork ·
MEP-Electrical works ·
MEP-Airconditioning works ·
And so on |
As above |
score |
5 |
|
|
|
|
9 |
Timeliness -for preparation, comprehensiveness, and release of
Target/estimated Project Costs in Rs or USD & or Rs or
USD/sqft including (BOQ+ Labour+ direct construction variable costs)- |
As above |
score |
5 |
|
|
|
Package-wise
costs along with assumptions to be prepared. |
10 |
Timeliness -for preparation, comprehensiveness, and release of
design works vis a vis Working
drawing/GFC (Good for construction drawings) |
As above |
score |
5 |
|
|
|
|
11 |
Timeliness in obtaining
statutory approvals (Before or during construction) such as below but not
limited to: Zoning plans, Building
/site plans & drawings, building height
clearances, In principle approval for BOQ material specification of the works to
be constructed & many more, including Structural
design safety certification |
As above |
score |
5 |
|
|
|
|
12 |
Comprehensiveness & accuracy of technical specifications &
designs in tenders |
As above |
score |
5 |
|
|
|
|
13 |
Technical support to in-house purchase and contracting teams in
selecting consultants and contractors and incorporating clauses in their
agreements w. r. t. their scope of work, specifications, and deliverables |
As above |
score |
5 |
|
|
|
|
14 |
Quality of designs causing delays in project
execution due to inadequacy/rework of designs vis a vis various packages for
Architecture, Interior designing, MEP works vis a vis each package mentioned
earlier
|
As above |
score |
5 |
|
|
|
|
15 |
Rendering Support to Project construction team +Contractors during construction for issues related
to constructability of design and drawings |
As above |
score |
5 |
|
|
|
|
16 |
Rendering support to the QS team for carrying out measurements of
all related works vis construction packages including bills for substitute/extra
materials |
As above |
score |
5 |
|
|
|
|
17 |
Accuracy in the passing of outsourced consultant’s/service provider’s bills vis a vis
deliverable in agreement |
As above |
score |
5 |
|
|
|
|
18 |
Timeliness for release of: -
As-built drawings & design -
Revised Project costs vis a vis target |
As above |
score |
5 |
|
|
|
|
19 |
Timeliness in obtaining statutory approvals-post construction such as below but not limited to: · Deed of declaration for actual area
constructed · Occupation certificate, · Completion certificate etc. (This KPI may not apply to Interior
design) |
As above |
score |
5 |
|
|
|
|
20 |
Cost reduction/Value engineering in BOQ |
Savings in
Project cost |
Rs or USD |
5 |
|
|
|
|
|
Total |
|
|
100 |
|
|
* |
|
Notes: * Total score earned of all KPI parameters can be computed and used in annual appraisal/ promotion etc
· 80-100=Excellent
· 60-80= very good
· 40-60= average
· 20-40= below average
· Below 20=Poor
How to populate the KPI template
i)Here each row represents a KPI
parameter (along with the unit of measurement) with a score @5 for each KPI (as
an example for simplicity) thus adding up to a total KPI Target score of 100
mentioned in column 5 of template
ii) Basic inputs for computing actual
accomplishment vis a vis each KPI are given in the last column
iii) The values for the targeted KPI
and actual accomplishment, are to be filled in columns 6 & 7 respectively
iv) Thereafter score earned to be
determined as:
The actual value in column 7
……………………………………… X weightage
score in column 5
Target value in column 6
eg.
For the 1st KPI in row 1 is no of projects commercialized
with values as below
Target =10 (column 6)
actual= 9 (column 7)
weightage=5 (column 5)
Score earned will be = 9/10
x5=4.5
v)
Likewise score earned of each KPI to be computed in 20 rows and say it
works out to be = 85
vi) The total score earned as above
can serve as one of the relevant qualitative inputs for performance
appraisal. This score will classify
as an excellent category as the assumption mentioned at end of the table
vii) The HOD of Architecture, Interior
design or MEP functions can make modifications, to the number of KPIs, and their
description vis a vis this template in consultation with the Project head, CEO,
and MD
viii) Likewise, HOD of Architecture, Interior design, or MEP
functions assign different weightages to the KPI parameter listed in rows, instead
of keeping 5 as mentioned in the above illustration but the total of all KPI
must add up to 100 in column 5.
viii) Suggest separate sheet to be
prepared for Residential, commercial, hospitality, and other projects
ix) KPI can be developed by teams
of Design of Interior and MEP functions
based on a similar approach
KRAs- or Key result areas
While KPIs are applicable at the functional level, KRAs are applicable at the individual levels within the function. KRA can be driven by KPI, and the scoring method can be similar to KPI.
KPIs need to be separate for different levels, and positions within each design function. Therefore the number of KRA parameters can vary from level to level and positon to position depending on competence, role assigned to each design team member, and design package.
The overall score earned on KRA can provide meaningful inputs for developing a robust performance appraisal system based on the weighted average scores for the following:
i) Quantification score as computed in this blog based on KRA
ii) Qualitative score based on (applicable competencies to the level ) demonstrated by designer vis a vis 36 competencies identified (please refer to an earlier blog dated 1 st July 22)
Activities that can
adversely impact the business while developing KPI
§ KPI parameters are non -comprehensive
due to the following:
§ Not aligned to Corporate Objectives
§ Contain primarily transaction-related
mundane indices
§ Measures of accomplishment are
deliberately kept vague and not merit-based leading to the scope of
manipulation
§ Percent weightages assigned to each
KPI are biased with ulterior objectives of influencing outcome vis-à-vis
performance perspective.
§ Targets Set are biased (too stretched
or too loose) to reprimand or favor specific team members or specific levels of
employees, leading to demotivation/dissatisfaction.
§ The actual measurement carried out is
captured inaccurately or manipulated.
§ Making circular changes in the KPI
Targets or actuals during the performance review period and restoring original
values, with ulterior motives and simultaneously disabling the audit trail to
prevent detection.
§ In the
workflow/embedded software (that enables accessing of KPI) incorporating
incorrect indices vis-à-vis management-approved KPI indices by not exercising
prudence leads to mistaken capturing of % Weightages or Targets
Detailed about business activities to be performed for developing
the KPI are included in chapter 18 (annex 42B) in the handbook of the author
and titled” ETHICS in the real estate and hospitality industry, Volume 1-
Architectural, Interior design, and MEP services