Core Processes and Core Documents

(Refer to Annex 21A(2) to 21A(4) for a listing of activities in the author’s website)

Design of Architecture

(Refer to Annex 21A(2) for a listing of activities in the author’s website)

  • Design of Structure
  • Design of Architecture
  • Designof Façade
  • Design of external development
  • Design of landscape

Interior Designing

(Refer to Annex 21A(3) for a listing of activities in the author’s website)

  • Interior Design Plans
  • Furniture and furnishing
  • Reflected ceiling
  • Mechanical, Electrical, and Plumbing
  • Design and Drawings
  • Tender
  • Estimating costs
  • Handholding

Design of MEP

(Refer to Annex 21A(4) for a listing of activities in the author’s website)

  • Design of Electrical
  • Design of HVAC
Above are just illustrations and there are many more processes applicable as stated in the handbook

Core documents=38 (15+12+11)-function-wise details below

Core documents - Function -Design of architect=15

  • Design brief
  • Submission drawings
  • Design of structure
  • Design of architecture
  • Design of Facade
  • Design of external
  • Design of landscape
  • Tender documents
  • GFC drawings
  • Change orders
  • Structural stability certificate
  • Project cost estimate
  • As-built drawing
  • Renderings


The number range of these core documents is suggested to be 0001-9999

Above are just illustrations and there can be many more documents applicable


Core documents -Function-Interior designing =12

  • Design brief
  • Design of Finishing
  • Design of furniture
  • Design of equipment
  • Artwork design
  • Specification of materials
  • Tender documents
  • GFC drawing
  • Change orders
  • Project cost estimate
  • “As-built” drawing
  • Renderings

The number range of these core documents is suggested to be 0001-9999

Above are just illustrations and there can be many more documents applicable


Core documents -Function-Design of MEP =11

  • Design brief
  • Design of electrical
  • Design of HVAC
  • Design of MEP-Others
  • Specification of materials
  • Tender documents.
  • GFC drawings
  • Change orders
  • Health and environment safety documents
  • Project cost estimate
  • As-built drawing


The number range of these core documents is suggested to be 0001-9999

Above are just illustrations and there can be many more documents applicable